Construction Terms Beginning With “C”

Structural & Architectural Terms

1. Cantilever

Definition: A projecting structural element supported at only one end, creating an unsupported overhang.

Key Characteristics:

Applications:

2. CMU (Concrete Masonry Unit)

Definition: Precast concrete blocks used in construction, typically 8″ × 8″ × 16″.

Types:

Advantages:

3. Coping

Definition: The protective cap or covering on top of masonry walls or parapets.

Primary Functions:

Common Materials:


Construction Processes & Techniques

4. Curing

Definition: The process of maintaining adequate moisture and temperature in freshly placed concrete to ensure proper hydration.

Critical Factors:

Methods:

  1. Water Curing: Ponding, sprinkling, or wet coverings
  2. Membrane Curing: Liquid compound application
  3. Steam Curing: For accelerated strength gain
5. Cut-and-Fill

Definition: The earthmoving process of excavating material from one area (cut) and using it to raise another area (fill).

Engineering Considerations:

Equipment Used:


Electrical & Mechanical Terms

6. Conduit

Definition: Raceways that protect and route electrical wiring.

Types and Applications:

TypeMaterialCommon Uses
EMTThin-wall steelCommercial exposed work
RMCThick-wall steelIndustrial applications
PVCPlasticUnderground installations
FMCFlexible metalVibrating equipment connections

Installation Standards:

7. Chiller

Definition: A mechanical device that removes heat from liquid for HVAC cooling.

Key Components:

System Types:


Contractual & Project Management Terms

8. Change Order

Definition: A formal document that modifies the original construction contract.

Essential Elements:

  1. Description of change
  2. Cost impact (increase/decrease)
  3. Time impact (schedule changes)
  4. Approval signatures

Best Practices:

9. Certificate of Occupancy (CO)

Definition: Official document issued by local government allowing building occupancy.

Inspection Requirements:


Materials & Finishes

10. Caulk

Definition: Flexible sealant used to fill gaps and joints.

Selection Criteria:

TypeBest ForLifespan
SiliconeWet areas (showers)20+ years
PolyurethaneExterior applications10-15 years
Acrylic latexInterior paint-grade5-7 years

Application Tips:

11. Cladding

Definition: Exterior material attached to a building’s structural frame.

Common Systems:

Performance Factors:


FAQs: Construction “C” Terms Explained

Q: What’s the difference between curing and drying concrete?

A: Curing actively maintains moisture for chemical hydration (28 days), while drying refers to moisture evaporation before finishes can be applied.

Q: When would you use a cantilever design?

A: When site constraints prevent conventional supports, for architectural statements, or to span obstacles without intermediate supports.

Q: How are change orders calculated?

A: Typically include direct costs (materials/labor) plus overhead/markup (usually 10-15%), and documented schedule impacts.


Conclusion & Next Steps

This comprehensive guide to construction “C” terms provides professionals with the precise language needed for: